Armasteel
Custom DesignDelivered6 months

Two 5-axis welding robots — 16 meters of linear travel

Complete design, 3D modeling, fabrication, and programming of two 5-axis welding robots with real-time infrared tracking and 16 meters of linear travel for Armasteel.

01

The Industrial Challenge

Armasteel needed an automated system to make continuous, uniform welds on long steel profiles up to 16 meters, while maintaining consistency across different welding angles.

02

Deployed Engineering & Method

RAFI Robotiques et Machineries designed a 5-axis robotic system mounted on a 16-meter linear rail. Infrared sensors adjust the feed speed in real time to match the welding angle. We also developed a robust, easy-to-use operator interface.

03

Measurable Result

The two robots provide a 16-meter reach and produce high-quality welds without manual rework. The system increases productivity and can be used for heavy steel structures, shipbuilding, and automotive manufacturing.

Matissar
Automation & PLCDelivered10 Days

Emergency PLC Reprogramming — Spring Assembly Machine

Complete reconstruction of the sequential logic, emergency on-site PLC reprogramming, and restart of Matissar's spring assembly line at full production speed.

01

The Industrial Challenge

Matissar's spring assembly machine stopped unexpectedly after the programmable logic controller (PLC) memory was accidentally erased, bringing the entire production line to a halt.

02

Deployed Engineering & Method

Our automation engineers were dispatched to the site. We analyzed the machine kinematics and sensors, rewrote the PLC program (Ladder/Grafcet), reprogrammed the safety functions, and optimized cycle times.

03

Measurable Result

Full production capacity was restored in 10 days. Cycle times were optimized, reliability improved, and a documented program backup was delivered to the client.

Univers Acier
RepairDelivered12 Days

Custom bronze gear machining — Sharmaann boring mill

Complete disassembly, measurement and reverse engineering, and custom manufacture of special bronze gears for a Sharmaann horizontal boring mill at Univers Acier.

01

The Industrial Challenge

Univers Acier's heavy Sharmaann horizontal boring mill was out of service after its worm gears broke and became severely worn. The original parts were unavailable, and import delays were too long for the plant.

02

Deployed Engineering & Method

We disassembled the transmission in our workshop, measured and reverse-engineered the components, selected a wear-resistant bronze alloy, and manufactured the gears to order. We then reassembled the mechanism and checked clearances and tolerances.

03

Measurable Result

The machine was returned to service in 12 days. The transmission runs quietly without residual mechanical play, restoring boring accuracy and extending the machine's service life.

Belhou Frères
RepairDelivered10 Days

CNC Press Brake Recalibration and Shear Blade Adjustment

Complete geometric and electronic recalibration of a CNC press brake, with precision sharpening of the shear blades.

01

The Industrial Challenge

Belhou Frères' CNC press brake was out of service because its axis stops were misaligned and the shear blades were badly worn. The wear caused burrs and prevented clean cuts in thin sheet metal.

02

Deployed Engineering & Method

We diagnosed the equipment and recalibrated the press brake's mechanical and electronic components. We removed and ground the shear blades, sharpened them, and precisely adjusted the clearance between them.

03

Measurable Result

The equipment was returned to working order in 10 days. Bending angles were brought back to the required accuracy, and the shear produced clean cuts across the specified sheet thicknesses.

Mif Maroc
CNC retrofittingDelivered10 Days

Electronic Overhaul & Complete CNC Retrofit of Plasma Table

Complete electronic refurbishment, installation of a new compact control unit, and return to service within 10 days of Mif Maroc's CNC plasma cutting table.

01

The Industrial Challenge

After a major failure in the central control unit stopped the machine, Mif Maroc faced serious delivery delays. The electronics, wiring, and servomotors were also showing significant wear.

02

Deployed Engineering & Method

We removed the old electronics and installed a compact, latest-generation numerical control unit. We replaced the faulty servomotors, repaired the shielded wiring, installed high-precision torch sensors, and recalibrated the X, Y, and Z axes.

03

Measurable Result

Cutting precision was restored, feed rates were optimized for thin and thick steel sheets, and full production resumed within 10 days. The work is covered by a 2-year warranty.

Longofer
RepairDelivered14 Days

Siemens SINUMERIK 840D System Diagnosis & Restart — Gemine CNC Lathe

Restoration of the SINUMERIK 840D operating system, reconfiguration of the SIMODRIVE 611 drives, and release of the Z-axis on a Gemine CNC lathe for Longofer.

01

The Industrial Challenge

Longofer's heavy Gemine CNC lathe was completely stopped after its Z-axis seized. Multiple critical alarms were caused by corruption of the Siemens SINUMERIK 840D operating system and overwritten drive parameters.

02

Deployed Engineering & Method

Our CNC specialists restored the Siemens system image, reconfigured the machine parameters, and recalibrated the speed and position loops on the SIMODRIVE 611 drives.

03

Measurable Result

Communication was fully restored and the Z-axis released. The lathe returned to smooth operation and was back in service within 14 days.

Industrie Métallurgique
Automation & PLCDelivered10 Days

Safety PLC replacement and complete reconfiguration — Adira press brake

Replacement of the faulty safety module, rewriting of the PLC program, and complete reconfiguration of an Adira CNC press brake after a power outage.

01

The Industrial Challenge

The Adira press brake, a key machine in the workshop, stopped after its safety module failed. A prolonged power outage also erased and corrupted software parameters and calibration tables.

02

Deployed Engineering & Method

Our automation specialists replaced the faulty unit with a new Category 4 industrial safety PLC, programmed reinforced safety logic for light curtains and emergency stops, and reloaded the manufacturer's parameters.

03

Measurable Result

The press brake was returned to service in 10 days. Operator safety was restored to the highest certified level, and bending resumed to zero-tolerance specifications.

Ilpea Galvarplast
Custom DesignIn ProgressFinal CAD Phase

Precision cutting and perforation prototype station (1,500 mm)

Design and 3D CAD modeling of a custom manual prototype station for angled cutting and perforating profiles up to 1,500 mm.

01

The Industrial Challenge

Ilpea Galvarplast needed a custom, ergonomic manual workstation for profiles up to 1,500 mm, with variable cutting angles and repeatable perforation without deforming the material.

02

Deployed Engineering & Method

We designed the prototype in Autodesk Inventor with adjustable micrometric stops, a quick-clamping system, and interchangeable perforation dies. The client's feedback was incorporated into version 2.1.

03

Measurable Result

The client approved the final design phase. The manufacturing file is being prepared for machining and assembly at our facility.

Univers Acier
CNC retrofittingIn ProgressActive Commissioning

Modernization & CNC Retrofit of Three Heavy Machines

Complete mechanical and electronic refurbishment of a large CNC lathe and two cylindrical grinders, with a Made-in-Morocco CNC controller, for Univers Acier.

01

The Industrial Challenge

Three critical machine tools—a large CNC lathe and two cylindrical grinders—were out of service because their original numerical controls had become obsolete.

02

Deployed Engineering & Method

We renewed the machines mechanically, replaced the guideways and ball screws, integrated current synchronous servomotors, and installed RAFI's CNC control unit developed in Morocco.

03

Measurable Result

Assembly and wiring are under way. The project will give three major machines a sustainable second life, with local maintenance guaranteed.